COVID-19: Aqaba Container Terminal is fully operational 24/7. To learn more about the latest Corona Virus measures taken by Jordan Maritime Commission click here , and  visit our News Room for more information about measures taken by the terminal.

act-equipment

Equipment

Combined with the facilities offered in the port of ACT, our modern, high-quality, well maintained equipment ensures the highest levels of efficiency and 24/7 operations.

Ship-to-Shore Cranes

Equipment  Fantuzzi (2001) ZPMC (2006) ZPMC (2009) ZPMC (2012)
 Number  1  2  2  2
 Lifting capacity under spreader  40 ton  52 ton  65 ton  65 ton
 Lifting capacity under hook  45 ton  85 ton  100 ton  100 ton
 Outreach on water side  44 m  44 m  52 m  63 m
 

Rubber Tire Gantry (RTG)

Equipment ZPMC (2006)  Eco ZPMC (2008) ZPMC (2012)
 Number  12 6 4
 Lifting Capacity  50 ton 50 ton 40 ton

Reach Stackers

Equipment Fantuzzi (2004) Terex (2015) Kalmar (2018)
 Number  3  2  2
 Lifting Capacity 45 ton 45 ton 45 ton
 Stacking Height 5 containers 5 containers 5 containers

Empty Handler

Equipment Fantuzzi (2004) Terex (2015) Kalmar (2020)
 Number  4  4  2
 Lifting Capacity  8 ton 10 ton 8 ton
 Stacking Height  5 containers  7 containers  7 containers

Terminal Truck

Equipment Terberg
 Number 46
 Lifting Capacity on 5th wheel 34 ton